Case Studies
Take a look at some of the projects we’ve successfully completed for clients across a range of sectors.




Cellar Cooler
Supply and installation of bespoke cellar cooling system, including equipment selection, refrigerant pipework, electrical connections, commissioning and system testing to provide reliable temperature control for the clients cellar.
Working with a live business environment required careful planning to minimise disruption to the client’s operations. As the existing cellar cooling system needed to be replaced during a hot summer period, with temperatures reaching 28 degrees celsius, our team worked efficiently to remove the old equipment and install, commission, and bring the new system into operation as quickly as possible. This minimised any increase in cellar temperature and ensured business continuity throughout the works.
South East, England
1 Day
Hospitality: Pub





Walk In Fridge
Supply and Installation of a bespoke walk in fridge, designed to maximise storage capacity while providing reliable and energy-efficient temperature control for a busy pub environment.
Working within a live commercial kitchen required careful planning to safely dismantle and remove the existing walk in fridge. The installation was coordinated to minimise disruption to the kitchen operations while maintaining a safe working environment for the staff and engineers.
Birmingham, England
3 days
Hospitality: Hotel




Air Conditioning
Supply, installation and commissioning of four new ceiling cassette air conditioning units, providing efficient and reliable climate control throughout a busy gym and studio.
Our main challenge was to completing the installation around the client’s scheduled studio classes. To minimise distruption, we carefully planned the works, carrying out installation of the outdoor units while the studio was in use and completing the indoor works during periods when the studio was unoccupied. This ensured the facility remained operational throughout the project.
Didsbury. England
4 days
Leisure: Gym





Commercial Boiler
Removal of the existing commercial heating system and installation of three new high-efficiency boilers within the plant room, including new pipework, flue system, valves and full commissioning to provide a reliable and energy-efficient heating solution.
Replacing the existing boiler plant while minimising disruption to the client’s heating and hot water services. Careful planning and phased installation ensured down time was kept to a minimum and the new system was commissioned efficiently.
London, England
15 day
Healthcare: Private Hospital
Why Choose Aurora HVAC?
- Nationwide commercial coverage
- Strong presence across the Midlands, South West and Southern England
- REFCOM Elite Accredited
- Constructionline Gold Certified
- Experienced Commercial Engneers
- Installation, Maintenance and Reactive support
- Long – Term maintenance partnerships
- Commitment to quality, safety and compliance





